Please see below the latest recovery action plan from around the Parish. If you have any issues or updates to add please contact us.  Please note this just covers the “recovery” tasks. The work of the various future planning teams is covered in the Flood Action Plan. Last updated Thursday 26th April 2018.

LATEST ACTION PLAN

Please see below the latest recovery action plan from around the Parish

#

Area

Issue

Current Status

Responsibility

Due Date

3

Glenridding

Beck Wall repair

Still need to complete monitoring centre by TIC and ramp below TIC. Reviewing work after heavy rain in November 2017 undermined part of the wall

EA

TBC

61

All

Improve communications

Will be setting up a flood group WhatsApp and also a Facebook page and community WhatsApp

CFG

Jun-18

60

All

Warden Coverage

Review warden coverage to ensure all areas covered

CFG

Jun-18

50

Grisedale

Drain at entrance to Grisdale Bridge

Road drain was tramaced over causing excess water to flow down Grisedale Bridge lane. Highways to investigate

Highways

Jun-18

66

Rookings

Place Fell Bridge

Need to widen bridge to allow vehicle access. CFG to spec, LDNP to supply materials and CFG will do the work

CFG/LDNP

Jun-18

64

Hartsop

Horsemans Bridge

Jez from EA to look at Horsemans Bridge and identify best way of managing gravel build up under bridge

EA/CFG

May-18

65

Grisedale

Horsemans Bridge

Jez from EA to look at Grisedale Bridge and identify best way of managing gravel build up under bridge

EA/CFG

May-18

26

Hartsop

Hartsop Road Hedge

Hedge by Hartsop Road End car park - Eric Wear has spoken to the Langton Centre people who've given permission for the hedge to be replace by a post/rail fence. Approval granted - work will be carried out by CFG - Note BT Cabinet. James to provide update based on discussion with Langton Centre

CFG

May-18

62

Glenridding

Benches and planters on Village Hall Road

EA to install benches and planters on village hall road to replace seating which was part of the old beck wall

EA

Jul-18

63

Glenridding

Under Glenridding Bridge

Highways looking at potentially putting a concrete pad under Glenridding Bridge to stop Gravel build up

Highways

Jul-18

4

Glenridding

Recycling Centre

EDC to repair once beck wall complete by EA

EDC

Jul-18

35

All

Beck monitoring - Depth Boards

Install depth boards at Grisedale and Horsemans Bridge

EA/CFG

Jul-18

53

Glenridding

Glenridding Flood Store

Repair Roof and sort electricity supply. LDNP formal handover complete

CFG

Jul-18

59

Hartsop

Build up bank above Horsemans Bridge

Once again on 22nd November Hayeswater Gill burst and significant water flowed down to Hartsop Road End. Need to build up the bank and remove stone from the beck to prevent this

CFG/NT

Jul-18

42

Grisedale

Clear Under Bridge

Working party to be arranged

CFG

Jul-18

43

Hartsop

Clear Under Bridge

Working party to be arranged

CFG

Jul-18

55

Deepdale

Clear Under Bridge

Working party to be arranged

CFG

Jul-18

46

Rookings

Clear beck behind rookings

Working party to be arranged

CFG

Jul-18

28

Hartsop

Howe Green Farm Repairs

NT Tender underway to identify flood mitigation schemes for HoweGreen and Side Farm

NT/NE

Dec-18

58

Glenridding

Pollard Gillside Trees

Need to pollard those trees that became undermined in the 22nd November storm

EA/CFG

Nov-18

52

Glenridding

Beck Mouth by Glenridding Sailing Centre

Scheme for stabilising gravel at beck mouth - planting etc

EA/CFG

Jul-18

51

Gillside

Between Caravan Site and Greenside

EA/ERT/CFG wortking jointly on proposal for work to stabilise gravel above the caravan site

EA/CFG

Jul-18

Contact Us Completed Jobs Contact Us CFG Beck Work List Completed Jobs Complete Issues List Pilot Project Section 19 Report - Aug 2017